Free calculator

Paver Base Calculator

Use this paver base calculator to estimate compacted base gravel and bedding sand for patios, walkways, and small hardscape projects. Enter area, base depth, sand depth, compaction allowance, waste, and material density to build a printable planning checklist.

EstimatePlanning range only; local conditions, traffic loads, drainage, and structural requirements vary.

Project inputs

Paver area lengthft
12
Measure the finished paved area.
Paver area widthft
10
Use average width for curves.
Base depthin
4
Compacted gravel base depth.
Bedding sand depthin
1
Common planning depth is 1 inch.
Compaction allowance%
20
Extra loose gravel before compaction.
Waste%
5
Extra for shape loss and grading.
Base densitytons/cu yd
1.55
Supplier density is preferred.
Sand densitytons/cu yd
1.35
Supplier density is preferred.
Bulk price$/cu yd
45
Optional placeholder for base and sand, not a local price guarantee.

Estimate

1.87 cu yd base gravel + 0.39 cu yd bedding sand

A 120 sq ft paver area with 4 inches of compacted base and 1 inch of bedding sand needs about 2.9 tons of base and 0.53 tons of sand.

Paver area120 sq ft
Base gravel1.87 cu yd
Base gravel weight2.9 tons
Bedding sand0.39 cu yd
Bedding sand weight0.53 tons
Estimated cost$101.70

Printable material list

Estimate
  • Compacted paver base gravel1.87 cu yd20% compaction and 5% waste included
  • Base gravel by weight2.9 tons1.55 tons/cu yd assumption
  • Bedding sand0.39 cu yd1 inch depth
  • Bulk cost placeholder$101.70$45/cu yd for base and sand
  • Bedding sand by weight0.53 tons1.35 tons/cu yd assumption
  • Edge restraint and spikesproject specificmeasure the exposed perimeter separately

Planning range only. Soil, drainage, freeze-thaw exposure, traffic loads, and local practice can require different base depth.

Visible defaults

Assumptions

Math

Calculation details

  1. Area = length x width.
  2. Base cubic feet = area x base depth in feet.
  3. Compaction allowance is added to the base layer before waste.
  4. Bedding sand is estimated as its own layer.
  5. Tons = cubic yards x selected material density.

What this paver base calculator includes

A paver project is not just pavers. The base layers determine how much excavation, hauling, and material handling the project requires. This calculator separates compacted base gravel from bedding sand, adds a compaction allowance to the base layer, applies waste, and converts the result to cubic yards and tons.

Use it for early planning on patios, walkways, shed pads, and small hardscape areas. It does not decide the correct base design for every site. Soil type, drainage, slope, freeze-thaw exposure, vehicle traffic, and local practice can change the required depth or material specification.

Base depth and compaction

The default base depth is 4 inches, which is a common planning depth for pedestrian projects on prepared ground. Some projects need less and others need more. Driveways, wet soil, clay, poor drainage, or freeze-thaw climates can require a thicker base and more careful preparation. Use the field as a planning input, not as a universal rule.

Compaction allowance accounts for the difference between loose delivered aggregate and compacted in-place base. If you need 4 inches compacted, you generally order more loose material than the finished volume. The calculator adds the compaction allowance before waste so the gravel number is not understated.

Formula used

The base gravel formula is area multiplied by base depth in feet. The compaction allowance is added to that volume, then the waste factor is applied. Cubic yards are cubic feet divided by 27, and tons are cubic yards multiplied by the selected gravel density.

Bedding sand is calculated as a separate layer. It uses the same area and the selected sand depth, then applies waste. The calculator does not add compaction allowance to the sand layer because bedding sand is usually screeded to a controlled depth rather than treated like the compacted aggregate base.

Measuring the project

Measure the finished paved footprint, not the excavation pile. For a rectangular patio, length times width is enough. For an L-shape, split the project into rectangles and add the areas. For a curve, use average width or sketch the area on grid paper. If edge restraints extend beyond the pavers, account for that extra base width manually.

Check depth against excavation limits before ordering. A 4 inch base, 1 inch sand bed, and 2.375 inch paver can require more than 7 inches below finished grade, plus any slope and drainage adjustment. The calculator estimates material, but the site still needs a workable grade plan.

Material checklist

The printable list includes base gravel, bedding sand, weight estimates, and a reminder for edge restraint. It does not include pavers, polymeric sand, geotextile, spikes, drainage pipe, excavation disposal, or rental tools. Those items depend on the paver choice and site conditions.

When talking to a supplier, ask what product they recommend for paver base in your area and whether they sell by ton, cubic yard, or bag. If the supplier gives a density or coverage chart, replace the defaults in the calculator so the order matches the local material.

Common mistakes

A frequent mistake is forgetting compaction and ordering only the finished compacted volume. Another is using bedding sand to correct large grade problems. The aggregate base should establish the shape and support, while the sand bed should be a controlled leveling layer. Too much loose bedding sand can move under pavers.

Do not assume a patio and driveway use the same base. Loads, water, and subgrade matter. This planning calculator gives quantities, not a structural recommendation. For heavy loads or difficult sites, get local professional guidance before building.

Quick reference

Common paver base depth by use

ProjectCommon base depthBedding sand
Walkway4 in1 in
Patio4-6 in1 in
DrivewayThicker base; get local guidance1 in

Planning ranges only, not code requirements. Soil, drainage, freeze-thaw exposure, and traffic loads can change the base depth.

FAQ

Paver Base Calculator FAQ

How do I calculate paver base material?

Multiply the paver area by base depth in feet to get cubic feet, add compaction and waste, then divide by 27 for cubic yards. Multiply cubic yards by density for tons.

How much paver base do I need for a 10x10 patio?

At 4 inches compacted base, a 10x10 patio needs about 1.23 cubic yards before compaction and waste. With 20 percent compaction and 5 percent waste, it is about 1.56 cubic yards.

How deep should paver base be?

Four inches is a common planning depth for pedestrian patios and walks, but soil, drainage, freeze-thaw exposure, and traffic can require a different depth.

Does bedding sand count as paver base?

No. The calculator separates compacted base gravel from bedding sand because they serve different roles and are ordered as different materials.

Why add a compaction allowance?

Loose aggregate takes up more volume than compacted aggregate. Adding a compaction allowance helps estimate how much loose material to order for a finished compacted base.

Does this include the pavers?

No. This calculator estimates base gravel and bedding sand. Paver count, cuts, edge restraint, joint sand, and accessories should be estimated separately.

Methodology

Who built and reviewed this estimate

Cody checks each hardscape formula against published coverage charts and public bulk-material references, and notes the rounding and waste in every result because real yards, compaction, and delivery minimums vary.

Cody Barnett

Written by

Cody Barnett

Hardscape contributor & reviewer · Fort Collins, CO

An experienced hands-on landscaping and hardscape laborer, not a licensed engineer, landscape architect, or certified mason.

Nathan Pruitt

Reviewed by

Nathan Pruitt

Founder & maintainer · Boise, ID

A software engineer and hands-on DIYer who builds and tests these tools, not a licensed engineer.

More about the people behind these calculators on the about page.

Keep planning